United Engineering is an Engineering, Procurement, and Construction contractor specializing in Electrical, Mechanical, and Plumbing works. We serve all construction sectors, including residential, commercial, mixed-use buildings, hospitals, hotels, schools, universities, airports, industrial, and special purpose projects.

Engineering

UEC provides engineering solutions meeting clients’ requirements engineered and supervised by highly qualified organizational technical engineers related to:

  1. Design & Built systems.

  2. Heat Load calculations, duct & pipe sizing.

  3. Water & drainage design.

  4. Fire networks design.

  5. Technical evaluation.

  6. Electrical loads.

  7. BMS, control & instrumentations design.

  8. Replacement & renovation solutions.

  9. Shop drawings, fabrication drawings & As-Built drawings.

UEC is committed to provide its clients with the highest materials profiles to maintain long-lift circle, our procurement department keep on going not only to provide the materials required for such project, instead, our highly qualified technical team is providing alternatives, make a materials logs and evaluation, suppliers evaluation, materials study in term of life and handling ..etc, all just to decrease the delivery time, and maintain project long life circle which leads to decrease the maintenance as well.

Procurement
Preconstruction Planning

Planning is must to achieve projects in timely manner, UEC strives and continues to strives to make sure planning has been taken into accountthe client’s needs, priorities, milestones, until the smooth operational start up.

 

UEC takes into account also the other services which are running in parallel with our services and makes sure to plan in coordination with other parties to generate planning integrated schedules in respect to all activities.

Construction

UEC cares to provide the highest profile employees to construction sites, in respect to qualifications, technical back ground, HSE matters, & quality control, in time of construction all measures are respected all to execute the project in timely manners meeting the clients and end users requirements & standards.

Testing & Commissioning

Part of our scope, UEC is committed to make sure that construction works has been done and completed and ready for testing & commissioning, UEC provides testing & commissioning services for its own projects and for others by approved NEBB 3rd party companies to make sure that systems are running smoothly, balanced & regulated as per system design and as per client requirements.

Maintenance

UEC provides maintenance services for its installation, UEC has a high profile maintenance team leading its maintenance operations related to:

1. HVAC system

2. Fire Fighting system

3. Water Supply & Drainage systems

4. Pipes & tubes Repair

5. Electrical System

6. Equipment

QUALITY CONTROL MEASURES

UEC defines and plans all activities at the beginning of the project in order to achieve the desired quality during execution. The Purpose of the Project Quality Management system is to define these activities / tasks that intends to deliver products while focusing on achieving customer’s quality expectations. These activities / tasks are defined on the basis of the quality standards set by the organization delivering the product. Basically we are guided by the ISO 9001 QMS requirements.

 

UEC Quality Plan identifies which Quality Standards are relevant to the project and determines how they can be satisfied. It includes the implementation of Quality Events (peer reviews, checklist execution) by using various Quality Materials (templates, standards, checklists) available within the organization. The holding of the Quality Event is termed as Quality Control. As an output of the various activities, Quality Metrics or Measurements are captured which assist in continuous improvement of Quality thus adding to the inventory of Lessons Learned. Quality Assurance deals in preparation of the Quality Plan and formation of organization wide standards.

 

UEC Quality Plan written with the objective to provide project management with easy access to quality requirements and ready availability of the procedures and standards thus mentioned.

 

The following list provides the various Quality Elements that are included in a detailed Project Quality Plan:

 

  • Management Responsibility: Describes the quality responsibilities of all stakeholders.

  • Documented Quality Management System: This refers to the existing Quality Procedures that have been standardized and used within the organization.

  • Design Control: This specifies the procedures for Design Review, Sign-Off, Design Changes and Design Waivers of requirements.

  • Document Control: This defines the process to control Project Documents at each Project Phase.

  • Purchasing: This defines Quality Control and Quality Requirements for sub-contracting any part / whole part of the project.

  • Inspection Testing: This details the plans for Acceptance Testing and Integration Testing.

  • Nonconformance: This defines the procedures to handle any type of nonconformance work. The procedures include defining responsibilities, defining conditions and availability of required documentation in such cases.

  • Corrective Actions: This describes the procedures for taking Corrective Actions for the problems encountered during project execution.

  • Quality Records: This describes the procedures for maintaining the Quality Records (metrics, variance reports, executed checklists etc) during project execution as well as after the project completion.

  • Quality Audits: An internal audit should be planned and implemented during each phase of the project.

  • Training: This should specify any training requirements for the project team.

Apart from the above, our quality control measures normally consider the following aspects:

  • Review of design drawings and specifications and identifying missing (if any)

  • Co-ordination with other trade drawings to verify all data and final locations of work to be done by others as required for the placing of electrical work.

  • Follow up of approval of material and equipment from damage.

  • Production of working drawings for execution.

  • Ensuring that the works to be executed in accordance to IEE wiring regulations especially as regards safety.

  • Testing which would include: insulating megger test on wires and cables, continuity and polarity tests, operational tests on all electrical equipment, Earthing continuity and resistance measurements.

  • Preparation of as built drawings, submittal of catalogues and manuals and labeling of circuits and equipment.

 
 

SAFETY POLICY

UEC is fully committed to prevention of accidents, minimizing all undesired events that could or do result in loss It is the company’s firm policy to implement the Loss prevention Program to prevent injuries & damages to property on and off the job. All possible measures have been taken considering to the safety of the workers and to prevent loss of all kind whatever it may be, to protect the Clients all the times and to prevent using any unwanted environmental side effects.

Our program consists of:

  • Considering the Environment

  • Prevent any kind of pollution.

  • Prevent accidents to persons.

  • Establish a real safe, healthy and productivity working environment.

  • Protect the material and equipment of property. We believe in our success on the implementation of our safety Program.

 

UEC having a project specific written Site Safety Policy & plan provides the foundation for every successful safety program and included as part of every contract issued to lower-tier subcontractors. Clearly stating the Site Safety Policy to every employee, contractor, subcontractor, and any other personnel on the site will go a long way in avoiding the expense, inconvenience, and other consequences of workplace accidents.

 

Obtaining written acknowledgements from everyone confirming that they have read understand and agree with the safety policy helping us to protect project organization when their workplace looks uncontrollable but with efficient implementation of safety plan, we optimize the budget & environmental impact.

 

The ultimate responsibility for Work Place Safety lies with Management and the Owners. An effective Site Safety Policy is an invaluable Tool for Step One of OSHA’s Four Step Safety Program Implementation Process. The Site Safety Policy & plan contains the essential elements of a safety policy in a variety of construction workplace environments posing different levels of hazards.

 

In general, the safety plan addresses the following:

 

  • Safety Policy & Acknowledgement Statement

  • Purpose of the Policy

  • Safety Analysis

  • Pre-Job Planning

  • Hazard Analysis

  • Method of Implementation

  • Administration

  • Reporting of Injuries

  • Notifications